Merge "API review feedback for ProgressBar" into nyc-dev
This commit is contained in:
committed by
Android (Google) Code Review
commit
5500bb1d6d
@@ -1397,6 +1397,10 @@ public class ProgressBar extends View {
|
|||||||
/**
|
/**
|
||||||
* Sets the current progress to the specified value. Does not do anything
|
* Sets the current progress to the specified value. Does not do anything
|
||||||
* if the progress bar is in indeterminate mode.
|
* if the progress bar is in indeterminate mode.
|
||||||
|
* <p>
|
||||||
|
* This method will immediately update the visual position of the progress
|
||||||
|
* indicator. To animate the visual position to the target value, use
|
||||||
|
* {@link #setProgress(int, boolean)}}.
|
||||||
*
|
*
|
||||||
* @param progress the new progress, between 0 and {@link #getMax()}
|
* @param progress the new progress, between 0 and {@link #getMax()}
|
||||||
*
|
*
|
||||||
@@ -1412,7 +1416,7 @@ public class ProgressBar extends View {
|
|||||||
|
|
||||||
/**
|
/**
|
||||||
* Sets the current progress to the specified value, optionally animating
|
* Sets the current progress to the specified value, optionally animating
|
||||||
* between the current and target values.
|
* the visual position between the current and target values.
|
||||||
* <p>
|
* <p>
|
||||||
* Animation does not affect the result of {@link #getProgress()}, which
|
* Animation does not affect the result of {@link #getProgress()}, which
|
||||||
* will return the target value immediately after this method is called.
|
* will return the target value immediately after this method is called.
|
||||||
|
|||||||
Reference in New Issue
Block a user